Install your laminated Berry Floors in a jiffy.
Laying laminate flooring... a job you have to experience yourself. Owing to the patented glueless BerryLOC® installation system, it is perfectly possible for you to install your laminate floor yourself as quickly and easily as you can imagine.
Surface Preparation
Berry Floor can be installed on most existing floors, eg. wooden floors, PVC, concrete floors. Soft long-piled wall-to-wall carpets should be removed. Make sure that the surface is level, dry and even (< 4 mm per 10 m). The supporting floor needs to be thoroughly dried.
- Wooden and woodbased materials max 50% relative humidity
- Concrete and light concrete floor max 85% relative humidity (max 2,0% CM)
- Plaster and plasterbased floor max 0,5% CM
All types of concrete floors, light concrete floors or ceramics demand a vapour barrier. Use a plastic film of at least 0,2 mm thickness. The film must be applied with a minimum of 20 cm overlap, taped and turned up against the walls, and clean-cut once the floor is installed. You also need an underlay material with a thickness of min 1-3 mm. Ideally the Berry Excellence underlay. Please consult your Berry dealer on this subject.
Preliminary Instructions
Keep the boards in room temperature for at least 48 hours in unopened package before you start the installation. The room temperature must be at least 18°C before and during installation. For floor surfaces exceeding 100 m² and/or lengths exceeding 10 m and overlaps to new rooms and floor surfaces which do not join symmetrically, use expansion joints to divide the floor sections.
Download a complete printable version [PDF]
|